Annfield

Annfield (Scottish Water) - UK

Since installing the DERAGGER II:

Reduction in callouts to attend choked pumps
Reduced the power consumption and power costs by more than 20%

Download PDF
Burnside

Burnside (Scottish Water) - UK

Since installing the DERAGGER II:

No longer suffers from any major blocking incidents
Reduction in operational costs from reduced manually lifting and cleaning.
Average energy saving of 46.8%.

Download PDF
2-260x208

Ross Point (Scottish Water) - UK

Since installing the DERAGGER II (Apr 2011):

No ragging issues since installation
35% reduction of electricity consumption
Cost benefit of £8,112 in first year.
Payback period of 5 months
Download PDF

5-260x208

Strontian (Scottish Water) - UK

No ragging issues
Ended expensive reactive callouts due to ragging at this isolated and difficult to reach site
Download PDF

4-260x208

Lake Worth (City of Lake Worth) - USA

Since installing the DERAGGER II (June 2014):

No ragging issues since installation
Increased flow rates
Download PDF

3-260x208

Western Avenue (Los Angeles County Sanitation Districts) - USA

Since installing the DERAGGER II (Nov. 2013):

No ragging issues
Reduction in electricity consumption by 4.5%
Download PDF

 

Translate »